Inner hero background

INTEGRATED MANUFACTURING INFRASTRUCTURE BUILT FOR PRECISION AND SCALE

From tool development to high-volume production under one structured system.

Infrastructure at a Glance

Available Land Area
1,30,800 sq.ft
Existing Build-up Area
36,000 sq.ft
Proposed Build-up Area
25,000 sq.ft
Certification
ISO 9001,
IATF 16949
Employees
240+ Skilled
Workforce
Injection Molding Machines
(5 Nos, 250 ton to 900 ton)
CNC Machines
25 Nos
Toolroom Machines
10 Nos

Design and Engineering Excellence

Design
  • CAD/CAM
  • Mold Design
  • DFM
  • Engineering Change Support
  • Fixture & Jigs Design
  • Prototype to Production Support

Toolroom and Mould Manufacturing

Toolroom
  • Mould size capability- upto 1600 ton Moulding Machine
  • Multi-cavity expertise
  • Trial validation process
  • Preventive maintenance system
  • Tool life optimization

Injection Moulding and Production Systems

Moulding
  • Tonnage range - 250 to 1200 ton Moulding Machine
  • Material expertise
  • Automation integration
  • Production ramp-up capability
  • Secondary operations
  • Supply chain support

Precision Machining Infrastructure

Machine
  • Speciality Materials like Titanium, Monel machining
  • Batch flexibility
  • Multi-shift operations
  • Structured production planning systems

Quality Systems and Metrology

Quality
  • CMM capability
  • Inspection labs
  • Process validation
  • Traceability
  • PPAP / APQP support

Scalability and Program Support

Support
  • Multi-shift operations
  • Export packaging
  • Long-term supply programs
  • Dedicated project teams
  • Structured production planning systems
Gallery 1Gallery 3Gallery 2Gallery 4Gallery 5Gallery 6